Powder Coating Quality Assurance & Certification
Powder Coating Quality Assurance
Quality assurance is built into every step of our coating process at Koojo Custom Powder Coating. Operating from our Milton facility since 2012, we hold formal certification through the Absolute Bureau of Certification, demonstrating adherence to documented quality procedures across all production runs.
Certified Quality Management | ASTM D7091 Thickness Verification | 48 Hr Turnaround | Since 2012 | 5.0 ★ Google Rating
Certificate Details
Our facility certification verifies that our operational processes, testing methods, calibration schedules and traceability records meet rigorous third-party industrial standards:
Detail | Information |
|---|---|
Standard / certificate type | ISO 9001:2015 Compliant Quality Management System |
Certifying body | Absolute Bureau of Certification |
Certificate number | Available upon request |
Issue and renewal dates | Annual audit cycle |
Scope | Custom and production powder coating, sandblasting and surface preparation for industrial, commercial and architectural metal |
Facility address | 10874 Steeles Ave E, Milton, ON L9T 2X8 |
Quality Assurance Checkpoints
Every job passing through our shop is logged and verified at six mandatory quality checkpoints:
Stage | What we check | When |
|---|---|---|
Receiving inspection | Incoming condition, damage, oil/grease, alloy type and drawing specs | Upon arrival |
Surface preparation check | Cleanliness, blast profile depth (SP 6 / SP 10) and masking accuracy | Before powder application |
Application check | Even powder spray, gun grounding, faraday corners and target mil build | During coating |
Cure verification | Oven air temperature, soak time and infrared surface temperature (180–200 °C) | During each bake cycle |
Post-cure inspection | Dry film thickness (ASTM D7091), cross-hatch adhesion (ASTM D3359), cure solvent rub and gloss | After cooling |
Final packing & sign-off | Visual defects, packaging protection and QC log sign-off | Before release |
Standard Testing & Inspection Methods
We test coated parts using standardized ASTM protocols to ensure long-term durability and corrosion protection:
Test | Method | What it shows |
|---|---|---|
Dry Film Thickness (DFT) | Magnetic or eddy-current gauge (ASTM D7091) | Verifies coating thickness meets specification |
Cross-Hatch Adhesion | Cross-cut blade with pressure tape (ASTM D3359) | Confirms adhesion of powder coat to prepared substrate |
MEK / Solvent Rub Cure Test | Solvent rub resistance test (ASTM D5402) | Confirms complete polymer crosslinking and cure |
Impact Resistance | Falling dart impact tester (ASTM D2794) | Measures coating resistance to cracking upon mechanical shock |
Gloss Level Verification | 60° gloss meter | Verifies surface gloss matches approved master sample |
Traceability & Documentation
For defense, automotive, structural and municipal contracts, we supply formal inspection certificates detailing batch numbers, powder manufacturer data sheets, dry film thickness readings and cure logs upon request.
Discuss Quality Requirements
If your project requires compliance with specific engineering standards (CGSB, ASTM, AAMA or SSPC), contact our quality assurance team at (905) 876-7060 or include your quality spec with your quote request.

Frequently asked questions
Who certifies Koojo's quality system?
The Absolute Bureau of Certification LLC. Its certification covers the quality assurance behind our powder coating and mobile sandblasting work, and a copy of the certificate is available on request.
Can I get test results for my parts?
Yes. Ask when you order and we will supply an inspection report with DFT readings and adhesion results. Third-party reports are also available on request.
What happens if a part fails a check?
It does not leave the shop. The cause is found, the part is corrected and the check is repeated before release.
Ready to get your parts coated?
Tell us what you have and when you need it back.