10874 Steeles Ave E, Milton, ONMon to Fri, 7 AM to 5 PM(905) 876-7060

Powder Coating Quality Assurance & Certification

Powder Coating Quality Assurance

Quality assurance is built into every step of our coating process at Koojo Custom Powder Coating. Operating from our Milton facility since 2012, we hold formal certification through the Absolute Bureau of Certification, demonstrating adherence to documented quality procedures across all production runs.

Certified Quality Management | ASTM D7091 Thickness Verification | 48 Hr Turnaround | Since 2012 | 5.0 ★ Google Rating

Certificate Details

Our facility certification verifies that our operational processes, testing methods, calibration schedules and traceability records meet rigorous third-party industrial standards:

Detail

Information

Standard / certificate type

ISO 9001:2015 Compliant Quality Management System

Certifying body

Absolute Bureau of Certification

Certificate number

Available upon request

Issue and renewal dates

Annual audit cycle

Scope

Custom and production powder coating, sandblasting and surface preparation for industrial, commercial and architectural metal

Facility address

10874 Steeles Ave E, Milton, ON L9T 2X8

Quality Assurance Checkpoints

Every job passing through our shop is logged and verified at six mandatory quality checkpoints:

Stage

What we check

When

Receiving inspection

Incoming condition, damage, oil/grease, alloy type and drawing specs

Upon arrival

Surface preparation check

Cleanliness, blast profile depth (SP 6 / SP 10) and masking accuracy

Before powder application

Application check

Even powder spray, gun grounding, faraday corners and target mil build

During coating

Cure verification

Oven air temperature, soak time and infrared surface temperature (180–200 °C)

During each bake cycle

Post-cure inspection

Dry film thickness (ASTM D7091), cross-hatch adhesion (ASTM D3359), cure solvent rub and gloss

After cooling

Final packing & sign-off

Visual defects, packaging protection and QC log sign-off

Before release

Standard Testing & Inspection Methods

We test coated parts using standardized ASTM protocols to ensure long-term durability and corrosion protection:

Test

Method

What it shows

Dry Film Thickness (DFT)

Magnetic or eddy-current gauge (ASTM D7091)

Verifies coating thickness meets specification

Cross-Hatch Adhesion

Cross-cut blade with pressure tape (ASTM D3359)

Confirms adhesion of powder coat to prepared substrate

MEK / Solvent Rub Cure Test

Solvent rub resistance test (ASTM D5402)

Confirms complete polymer crosslinking and cure

Impact Resistance

Falling dart impact tester (ASTM D2794)

Measures coating resistance to cracking upon mechanical shock

Gloss Level Verification

60° gloss meter

Verifies surface gloss matches approved master sample

Traceability & Documentation

For defense, automotive, structural and municipal contracts, we supply formal inspection certificates detailing batch numbers, powder manufacturer data sheets, dry film thickness readings and cure logs upon request.

Discuss Quality Requirements

If your project requires compliance with specific engineering standards (CGSB, ASTM, AAMA or SSPC), contact our quality assurance team at (905) 876-7060 or include your quality spec with your quote request.

Koojo quality assurance certification marks

Frequently asked questions

Who certifies Koojo's quality system?

The Absolute Bureau of Certification LLC. Its certification covers the quality assurance behind our powder coating and mobile sandblasting work, and a copy of the certificate is available on request.

Can I get test results for my parts?

Yes. Ask when you order and we will supply an inspection report with DFT readings and adhesion results. Third-party reports are also available on request.

What happens if a part fails a check?

It does not leave the shop. The cause is found, the part is corrected and the check is repeated before release.

Ready to get your parts coated?

Tell us what you have and when you need it back.